In 2023, the T2K ND280 upgrade entered its final phase. The ND280 upgrade consists of the installation of three new subdetector systems, a novel scintillator tracker (SuperFGD), two high-angle time project chambers (HAT) and a time of flight (TOF) detector, in the existing ND280 detector. The effort was coordinated by the PI of the IFAE group who, together with other group members, stayed for this reason for the first half of 2023 at CERN where the first HAT and the TOF were assembled and commissioned before being shipped to J-PARC (Japan). In the 2nd half of 2023, the installation work at J-PARC started and the first neutrino beam data was taken with the SuperFGD, one of the HAT and a part of the TOF system. The rest of the detectors will be installed in the first half of 2024.
Furthermore, members of the group are working on event reconstruction for Water Cherenkov detectors in the context of Hyper-Kamiokande.